See Where We Have Already Helped Save Energy and Worries.

NEUFE PŘIBYSLAV

Management

Enposol EMS

Battery

Capacity 1 MWh
BESS power 500 kW

Cogeneration Units

200 kW

Photovoltaic Power Plant

500 kWp

Solution

  • 5x battery cabinet
  • 1x BCP cabinet
  • 2x 500 kW inverter in double conversion


Battery Composition

  • LiFePo4


Usage

  • Transition using double conversion (0 milliseconds)
  • Advance payment and energy self-sufficiency in case of a blackout
  • Trading on the stock exchange (working with current prices)
  • Heat storage tank control
  • Sale of electricity and heat to other buildings
  • Control of cogeneration units

VIRGIN MEDIA DUBLIN

Management

Enposol EMS

Battery

Capacity 1.2 MWh
BESS power 1 MW

Solution

  • 4x battery cabinet
  • 1x BCP cabinet
  • 1x power container

Battery Composition

  • LiFePo4

Usage

  • Data center backup
  • Network stabilization

MOGADOR

Management

Enposol EMS

Battery

Capacity 1165 kWh
BESS power 500 kW

Solution

  • 5x all in one kabinet + STS


Battery Composition

  • LiFePo4
  • Advance payment for the entire factory with transition to
    10 ms
  • Trading on the exchange based on current electricity and gas prices
  • Integration of PV systems and new cogeneration units (KGJ)
  • Management of KGJ and the entire energy mix
  • Use of heat from KGJ for production in the factory
  • Calculating whether it is more advantageous to purchase or generate electricity
  • Deciding whether to store or sell energy
  • Peak shaving — reduction of peak consumption

QALT RAKOVNÍK

Management

Enposol EMS

Battery

Capacity 1.45 MWh

Power cabinet

240 kVA

Solution

  • 6x battery cabinet
  • 1x BCP cabinet
  • 1x power cabinet


Battery Composition

  • LiFePo4


Usage

  • Capturing overflows from FVE for later use
  • Planning battery power delivery using a schedule

GEBRÜDER WEISS SYROVICE

Photovoltaic Power Plant

170 kWp
Number of panels 382 pcs
Annual production 181 MWh

Solution

  • 6x battery cabinet
  • 1x BCP cabinet
  • 1x power cabinet


Battery Composition

  • LiFePo4


Usage

  • Capturing overflows from FVE for later use
  • Planning battery power delivery using a schedule

GEBRÜDER WEISS JENEČ

Charging Station

2x22 kW AC
Number of stations 4 pcs

Photovoltaic Power Plant

1 MWp
Number of panels 2,172 pcs
Annual production 921 MWh

Solution

  • Photovoltaic Power Plant
  • Charging Station
  • New collection system

PENNY MARKET
SKUTEČ & LÁDVÍ

Management

Enposol EMS

Battery

Capacity 305 kWh
BESS power output 230 kW

Solution

  • 3x internal battery rack


Battery Composition

  • LiFePo4

Naše řešení využívají i další společnosti

How to Implement Your Energy Project

First Contact

We'll call or meet and go over your goals, needs and vision for a solution.

Analysis and Solution Design

We will assess the limits and opportunities, prepare a technology proposal and calculate the return.

Administration and Permits

We will help you with the necessary documentation and permits, if required.

Implementation and Installation

We provide complete installation, system configuration and commissioning.

Testing and Handover

We will test the battery storage facility and hand it over for official use.

Service

We monitor the operation of the storage facility and ensure its regular servicing.

Optimize Energy. Increase Performance.

Get in touch to find out how our systems can make you money.

Optimalizujte energii.
Zvyšte výkon.

Get in touch to find out how our systems can make you money.

Together, let's take the first step towards more efficient energy.

By sending the message I agree to the processing of personal data according to the privacy policy.

We create technologies that have impact.
Join us.

By sending the message I agree to the processing of personal data according to the privacy policy.